Rackmount cable length calculations & best practices

41,212

Solution 1

There is no special tool that I've found for figuring out the length you need. I used pre-made cables on a rack a few months ago and it came out ok; not too messy. I just finished up another rack and made each cable myself. I would terminate one end, plug it in and route to the proper switch port. Add about an inch, cut and terminate. The manpower is much higher but the finished product is a thing of beauty. It all depends on how your being paid and what your workload is.

When I used premade calbes I created a spreadsheet to calculate the vertical length of the run by subtracting the differences in elevation (in U's) and multiplying by 1.75". I then added 3' for the combined horizontal distance and rounded up to the next standard length (3', 5', 7', 10' etc...) Of course this only worked for cables terminating in the same rack.

Solution 2

Best wishes for the cleanup project. A wise move - but one management rarely will understand...

  1. If you are using more than 1 rack - USE PATCH PANELS - a punch down tool and patch panels allow for you to very simply run cable at any length you desire - very clean and neat. AND when complete - you can than close up everything and just place in short patch cables. One reason I love this approach is because it allow for you to never have to replace anything but the patch cable ever again. When using more than 1 rack We setup 1 rack as a mini-MEET-ME rack or cabinet. It makes a huge difference and is very clean, allows all switches to be in one location - and works for both Fiber as well as Copper/Ethernet.

  2. Don't forget about the sides of the rack as well. alt text

  3. Learn to create your own patch cables. This is not that hard of a task - it will help your in your career long term...

  4. Label - Label - Label - It is important to understand where everything runs - to and from. Generally larger datacenters will create a block scheme with numbers running one way and letters on the opposite wall. This helps you figure out where the wires are going - in a large facility. You can do much the same here - simply keep whatever your doing the same across the board.

  5. Use a system such as RackTables to help you manage everything long term. It is opensource and costs nothing but time.

  6. Use Cable Straps or Velcro - Zip ties are bad business - if they are to tight you can actually kill the speed / transmission rates of the wire

  7. Use a good color scheme: Orange = Fiber, Blue = switch to switch, Yellow = Cross-over, etc etc et

  8. One last note - ALWAYS TEST ALL CABLES - a good cable tester will help you always.

Solution 3

I like to cut them to exact lengths, with a little practice you can run a new line every ~2 minutes. If things are color-coded, neat and cut to length, chances are the next guy who walks in won't want to mess up your handy-work. As a bonus, they won't have to tug on a bunch of cables to figure out where something runs, (hopefully) they might even try to follow your lead for future installations :)

alt text

Solution 4

I second Zoredache's comment, making cables leaves a huge margin of error that will be far more difficult and time consuming to do than dealing with a messy server room.

Crimping patch cables, even if you have your technique down pat, I have never seen take quicker than approximately 90 seconds. Combine that by 100 and you can pop down to your local wholesaler and pick up 100 patch leads with time to spare.

Now to your question, there are fairly standard lengths (10cm, 30cm, 50cm, 1m). You need to find the closest match (that's longer, obviously), and cable tie the bunches together. Given a rack is 19" wide, it's generally less than 19" of "slack" in each cable compared to the longest distance, so hiding that much length to make it appear tidy is usually just as letting the cable sag behind the server by a few cm.

Don't forget that if your server is on sliding rails, you need to give the cables enough slack that you can slide the server out, which is often up to 80cm.

What you're seeing in these beautiful server rooms is the front of the racks. Generally I always mount my switches at the back of the rack, and they never, ever, look as neat as those rooms, nomatter how hard I try or effort I put it.

Far more important than making it look nice is a decent labling scheme. There are are good questions about that on here if you do a bit of a search around.

Solution 5

Yes some pros - or their cabling contractors - measure every cable to make it 'just perfect' but most people just round to the nearest metre or half-metre - and they just do it the way you would, with a tape-measure or similar.

Don't forget the 100m per run rule either.

Share:
41,212

Related videos on Youtube

Jake Wilson
Author by

Jake Wilson

Updated on September 17, 2022

Comments

  • Jake Wilson
    Jake Wilson almost 2 years

    I'm redoing the cable management for a small company with a modest server room. It's my first time trying to organize an absolute mess that their former IT-guy left.

    A huge problem that I'm finding is that very long Ethernet cords were used where short ones should have been used. I assume the IT guy was just too lazy to make a one foot cable that would fit nicely, and instead opt'ed to grab the nearest 10 foot cable. Repeat this two-dozen times and its a real mess.

    As I'm going about making new cables and replacing existing ones, I'm wondering if there are any sorts of best practice methods for determining the exact cable length needed in server rooms besides obviously just using a measuring tape. I'm taking a measuring tape and trying to determine how long it is from point A to point B (routed properly and neatly).

    I see so many excellent pictures of nicely wired server rooms where all the wires look very tight and neat and it looks like the cables were cut to be EXACTLY the right length in every situation. Do the pro's who do those awesome jobs really measure out each required length for every single port? Or do they have some tricks up their sleeves for quick length calculations?

    • Zoredache
      Zoredache over 13 years
      Making cables seems like a bad idea. Unless you are working for free/cheap buying patch cables will be a lot more cost effective.
  • user3789902
    user3789902 over 13 years
    i like the RTFM sticker
  • tegbains
    tegbains over 13 years
    Are you saying that you make your own cables or that you have them custom made?
  • Jake Wilson
    Jake Wilson over 13 years
    I really like your approach: Terminating one end of the cable, leave the Cat5 box at your source port then routing/pulling the cable to its destination and then going back to the box and finding the length you need and then cutting and terminating it. Sounds much better than using a tape measure and then making the cable.
  • ben lemasurier
    ben lemasurier over 13 years
    I make them myself.
  • Glenn Kelley
    Glenn Kelley over 13 years
    NEVER USE CABLE TIES - instead use something like velcro or an actual cable strap.
  • Glenn Kelley
    Glenn Kelley over 13 years
    let me clarify ... zip ties are bad business... they can cause major transmission issues if they are done to tight... If you do mount your switch in the back of the rack - keep airflow in mind. Hot aisle vs cool aisle...
  • Jake Wilson
    Jake Wilson over 13 years
    Velco stripes > Zipties
  • petrus
    petrus over 13 years
    On the contrary, allways let some additional length to your fibers.
  • Vatine
    Vatine over 13 years
    One possibility would be to have a long piece of cable, with an TJ-45 connector at one end, having marked distances for each "standard" cable length you have. This would allow you to find the distance needed with something having the exact properties of a cable, routed "properly" and would probably lead to a good intuition for the required lengths after few iterations.
  • MrGigu
    MrGigu about 12 years
    I really like that method of removing the slack from cables that are all the same length. I must remember that for my next rack...
  • Michael Shigorin
    Michael Shigorin about 6 years
    Special kudos for RackTables, I know Denis since maybe 2004 or so (he used to live in Donbass back then) and we used RT to help keep our small free software hosting when it was still young...